Installation Procedure
WARNING: This page is about a different car, the 2009 Saturn Vue. However, it is still accessible from the selected car via links, so may be relevant.
- Install the right side cylinder head locator dowel pins and ensure proper installation before proceeding.
- Install the NEW right side cylinder head gasket.
- Install the right side cylinder head onto the locator dowel pins and the engine block.
- Install the NEW right side cylinder head bolts finger tight.
- Tighten the right side cylinder head bolts in sequence to 60 N.m (44 lb ft) plus an additional 95 degrees using J 45059 .
- Install the spark plugs to the right side cylinder head. Refer to Spark Plug Replacement .
- Install the right side exhaust manifold. Refer to Exhaust Manifold Replacement - Right Side (LZ4) .
- Install the valve rocker arms and pushrods to the right cylinder head. Refer to Valve Rocker Arm and Push Rod Replacement .
- Install the lower intake manifold. Refer to Lower Intake Manifold Replacement .
- Install the spark plug wires to the right side of the vehicle.
- Change the engine oil. Refer to Engine Oil and Oil Filter Replacement .
- Fill the cooling system. Refer to Cooling System Draining and Filling (Static Fill Without HP5) or Cooling System Draining and Filling (GE 47716 Fill Without HP5) .
- Inspect for any leaks.
CAUTION:
Head gaskets are specific for right hand and left hand applications, and also must be installed with the correct side facing up. Note the markings (1) on the head gaskets for proper installation. Failure to do so may lead to engine damage.
CAUTION:
This component uses torque-to-yield bolts. When servicing this component do not reuse the bolts, New torque-to-yield bolts must be installed. Reusing used torque-to-yield bolts will not provide proper bolt torque and clamp load. Failure to install NEW torque-to-yield bolts may lead to engine damage.
CAUTION:
Refer to Fastener Caution
.