Installation Procedure
WARNING: This page is about a different car, the 2007 Saturn Vue. However, it is still accessible from the selected car via links, so may be relevant.
- Ensure that the oil pan and the sealing surface on the lower crankcase are free of all oil and debris.
- Apply a 2 mm bead of sealant (1) around the perimeter of the oil pan and the oil suction port opening. DO NOT over apply the sealant. More than a 2 mm bead is not required. Refer to Sealers, Adhesives, and Lubricants .
- Install the oil pan.
- Install the oil pan bolts.
- Install the 4 oil pan to transaxle bolts.
Tighten: Tighten the bolts to 75 N.m (55 lb ft).
- Tighten the oil pan bolts in the sequence shown.
Tighten: Tighten the bolts to 25 N.m (18 lb ft).
- Install the generator control module coolant pump to the oil pan. Ensure that the anti-rotation tab is inserted into the hole in the oil pan.
- Install the generator control module coolant pump bolt.
Tighten: Tighten the bolt to 25 N.m (18 lb ft).
- Connect the engine wiring harness electrical connector (1) to the generator control module coolant pump.
- Lower the vehicle.
- Using the engine support fixture, lower the engine.
- Place the engine mount onto the side rail studs.
- Install the engine mount to side rail nuts (1).
Tighten: Tighten the nuts to 100 N.m (74 lb ft).
- Install engine mount to bracket bolts (2).
- Tighten the engine mount to bracket bolts in the following sequence.
- Middle
- Rear
- Front
Tighten: Tighten the bolts to 50 N.m (37 lb ft).
- Remove the engine support fixture.
- Install the oil level indicator tube. Refer to Oil Level Indicator and Tube Replacement .
- Install the drive belt. Refer to Drive Belt Replacement .
- Fill the engine oil to the proper leve.
NOTE:
Refer to Fastener Notice
.