LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2002 >> Blazer 4D Utility, 4WD, Part Time >> Repair and Diagnosis >> External Pages >> Different car >> Section 1812 (Battery, Charging System And Starting System) >> Repair Instructions >> Battery Tray Replacement (2.4L (LAT)) >> Installation Procedure

Installation Procedure

WARNING: This page is about a different car, the 2007 Saturn Vue. However, it is still accessible from the selected car via links, so may be relevant.
    Fig 1: View Of Battery Tray Hold-Down Bolts
    GM1814040Courtesy of GENERAL MOTORS CORP.
    NOTE: Refer to Fastener Notice .
  1. Install the battery tray and bolts.

    Tighten: 

    • Tighten the bolt (1) to 10 N.m (89 lb in).
    • Tighten the bolts (2) to 22 N.m (16 lb ft).

  2. Fig 2: Generator Control Module Bracket, Bolts And Stud
    GM1815938Courtesy of GENERAL MOTORS CORP.
  3. Install the generator control module bracket.
  4. Install the generator control module bracket bolts and stud.

    Tighten:  Tighten the bolts/stud to 10 N.m (89 lb in).

  5. Fig 3: Bracket And Nut
    GM1816288Courtesy of GENERAL MOTORS CORP.
  6. Install the positive battery cable bracket (2) to the stud.
  7. Install the air conditioning compressor and condenser hose nut (1) to generator control module bracket stud.

    Tighten:  Tighten the nut to 20 N.m (15 lb ft).

  8. Fig 4: Identifying Forward Lamp Wiring Harness Electrical Connector
    GM1813958Courtesy of GENERAL MOTORS CORP.
  9. Install the forward lamp wiring harness electrical connector (1) to the positive battery cable bracket.
  10. Fig 5: UBEC Bracket And Bolts
    GM1814038Courtesy of GENERAL MOTORS CORP.
  11. Install the UBEC bracket, align the locator pin (2) with the hole in the battery tray.
  12. Install the UBEC bracket bolts (1).

    Tighten:  Tighten the bolts to 9 N.m (80 lb in).

  13. Fig 6: Clips And Bolts
    GM1820891Courtesy of GENERAL MOTORS CORP.
  14. Install the 12 volt positive battery cable clips (4) to the UBEC bracket.
  15. Fig 7: Forward Lamp Wiring Harness Electrical Connector And UBEC Electrical Connector
    GM1814033Courtesy of GENERAL MOTORS CORP.
  16. Position the body wiring harness UBEC electrical connector (1) to the UBEC bracket and snap into place.
  17. Install the forward lamp wiring harness electrical connector (2) to the battery tray.
  18. Fig 8: View Of Clip And UBEC Connector
    GM1814036Courtesy of GENERAL MOTORS CORP.
  19. Position the engine wiring harness UBEC electrical connector (1) to the UBEC bracket and snap into place.
  20. Install the engine wiring harness clip (2) to the battery tray.
  21. Fig 9: Forward Lamp Wiring Harness Clips And Ubec Electrical Connector
    GM1814035Courtesy of GENERAL MOTORS CORP.
  22. Position the forward lamp wiring harness UBEC electrical connector (1) to the UBEC bracket and snap into place.
  23. Install the forward lamp wiring harness clips (2) to the positive battery cable bracket.
  24. Fig 10: Underhood Bussed Electrical Center (UBEC)
    GM1814045Courtesy of GENERAL MOTORS CORP.
  25. Position the UBEC and snap into place.
  26. Tighten the UBEC bolts (2) until the bolt engages the electrical connector, an audible click will be heard.

    Tighten:  Tighten the bolts to 4 N.m (35 lb in).

  27. Install the UBEC cover (1).
  28. Install the battery. Refer to Battery Replacement (2.2L (L61) and 3.5L (L66))  or Battery Replacement (2.4L (LAT)) .