LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2002 >> Blazer 4D Utility, 4WD, Part Time >> Repair and Diagnosis >> External Pages >> Different car >> Section 1797 (Supplemental Inflatable Restraint System) >> Repair Instructions >> Inflator Module Handling and Scrapping >> Deployment Inside Vehicle - Vehicle Scrapping Procedure

Deployment Inside Vehicle - Vehicle Scrapping Procedure

WARNING: This page is about a different car, the 2007 Saturn Vue. However, it is still accessible from the selected car via links, so may be relevant.

Deploy the inflator modules inside of the vehicle when destroying the vehicle or when salvaging the vehicle for parts. This includes, but is not limited to, the following situations:

  1. Lower the driver and passenger windows.
  2. Turn the ignition switch to the OFF position and remove the ignition key.
  3. Check that all inflator modules which will be deployed are mounted securely.
    • Driver inflator module is secured to steering wheel.
    • Passenger inflator module is secured to instrument panel.
    • Left roof rail inflator module is secured to left roof rail.
    • Right roof rail inflator module is secured to right roof rail.
  4. Put on safety glasses.
  5. Remove all loose objects from the front seats.
  6. CAUTION: A deployed dual stage inflator module will look the same whether one or both stages were used, always assume a deployed dual stage inflator module has an active stage 2. Improper handling or servicing can activate the inflator module and cause personal injury.
    Fig 1: CPA & Steering Wheel Module Coil Connector
    GM1244684Courtesy of GENERAL MOTORS CORP.
  7. Disconnect the steering wheel module yellow connector from vehicle harness yellow connector.
  8. Fig 2: Stripping SIR Wires
    GM566915Courtesy of GENERAL MOTORS CORP.
    IMPORTANT: If the vehicle is equipped with dual stage air bags the steering wheel module and I/P module will each have 4 wires. Refer to SIR Connector End Views  for determining high and low circuits.
  9. Cut the yellow harness connector out of the vehicle, leaving at least 16 cm (6 in) of wire at the connector.
  10. Strip 13 mm (0.5 in) of insulation from each of the connector wire leads.
  11. Fig 3: Fabricating 20 Ft. Deployment Harness
    GM68651Courtesy of GENERAL MOTORS CORP.
  12. Cut two 6.1 m (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. Use these wires to fabricate the driver deployment harness.
  13. Strip 13 mm (0.5 in) of insulation from both ends of the wires.
  14. Twist together one end from each of the wires in order to short the wires. Deployment wires shall remain shorted, and not connected to a power source until you are ready to deploy the inflator module.
  15. Fig 4: Twisting Connector Wire Leads (High Circuits) To Deployment Harness Wire
    GM566918Courtesy of GENERAL MOTORS CORP.
  16. Twist together the 2 connector wire leads from the high circuits from both stages of the steering wheel module, to one set of deployment wires. Refer to SIR Connector End Views  in order to determine the correct circuits.
  17. Inspect that the 3-wire connection is secure.
  18. Fig 5: Bending Twisted Connection Flat
    GM566922Courtesy of GENERAL MOTORS CORP.
  19. Bend flat the twisted connection.
  20. Fig 6: Insulating Connection With Electrical Tape
    GM566927Courtesy of GENERAL MOTORS CORP.
  21. Secure and insulate the 3-wire connection to the deployment harness using electrical tape.
  22. Fig 7: Twisting Connector Wire Leads (Low Circuits) To Deployment Harness Wire
    GM566932Courtesy of GENERAL MOTORS CORP.
  23. Twist together the 2 connector wire leads from the low circuits from both stages of the steering wheel module, to one set of deployment wires. Refer to SIR Connector End Views  in order to determine the correct circuits.
  24. Inspect that the 3-wire connection is secure.
  25. Fig 8: Bending Twisted Connection Flat
    GM566936Courtesy of GENERAL MOTORS CORP.
  26. Bend flat the twisted connection.
  27. Fig 9: Insulating Connection With Electrical Tape
    GM566942Courtesy of GENERAL MOTORS CORP.
  28. Secure and insulate the 3-wire connection to the deployment harness using electrical tape.
  29. Fig 10: CPA & Steering Wheel Module Coil Connector
    GM1244684Courtesy of GENERAL MOTORS CORP.
  30. Connect the deployment harness to the connector on the steering wheel module.
  31. Fig 11: Steering Wheel Module Deployment Harness Routed Out Of Driver Side Of Vehicle
    GM1332555Courtesy of GENERAL MOTORS CORP.
  32. Route the deployment harness out of the driver side of the vehicle.
  33. Fig 12: Locating CPA & Roof Rail Module Connector
    GM1244657Courtesy of GENERAL MOTORS CORP.
  34. Disconnect the yellow left roof rail harness connector from the vehicle harness connector.
  35. Fig 13: Identifying Proper Stripping Of Connection Wire Leads
    GM68649Courtesy of GENERAL MOTORS CORP.
  36. Cut the harness connector out of the vehicle, leaving at least 16 cm (6 in) of wire at the connector.
  37. Strip 13 mm (0.5 in) of insulation from each of the connector wire leads.
  38. Fig 14: Fabricating 20 Ft. Deployment Harness
    GM68651Courtesy of GENERAL MOTORS CORP.
  39. Cut two 6.1 m (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. These wires will be used to fabricate the roof rail air bag deployment harness.
  40. Strip 13 mm (0.5 in) of insulation from both ends of the wires.
  41. Twist together one end from each of the wires in order to short the wires.
  42. Fig 15: View Of Proper Twisting Of Connector Wire Lead To Deployment Wire
    GM68652Courtesy of GENERAL MOTORS CORP.
  43. Twist together one connector wire lead to one deployment wire.
  44. Fig 16: Bending Twisted Connection Flat & Insulating With Tape
    GM68660Courtesy of GENERAL MOTORS CORP.
  45. Bend flat the twisted connection.
  46. Secure and insulate the connection using electrical tape.
  47. Fig 17: Taping Remaining Connector Wire Lead To Remaining Deployment Wire
    GM68662Courtesy of GENERAL MOTORS CORP.
  48. Twist together, bend, and tape the remaining connector wire lead to the remaining deployment wire.
  49. Fig 18: Locating CPA & Roof Rail Module Connector
    GM1244657Courtesy of GENERAL MOTORS CORP.
  50. Connect the deployment harness to the yellow connector of the roof rail module.
  51. Fig 19: Roof Rail Module Deployment Harness Routed Out Of Driver Side Of Vehicle
    GM1332557Courtesy of GENERAL MOTORS CORP.
  52. Route the deployment harness out of the driver side of the vehicle.
  53. Fig 20: CPA & I/P Module Connector
    GM1244712Courtesy of GENERAL MOTORS CORP.
  54. Disconnect the I/P module yellow harness connector from the vehicle harness connector.
  55. Fig 21: Stripping SIR Wires
    GM566915Courtesy of GENERAL MOTORS CORP.
    IMPORTANT: If the vehicle is equipped with dual stage air bags the steering wheel module and I/P module will each have 4 wires. Refer to SIR Connector End Views  for determining high and low circuits.
  56. Cut the yellow harness connector out of the vehicle, leaving at least 16 cm (6 in) of wire at the connector.
  57. Strip 13 mm (0.5 in) of insulation from each of the connector wire leads.
  58. Fig 22: Fabricating 20 Ft. Deployment Harness
    GM68651Courtesy of GENERAL MOTORS CORP.
  59. Cut two 6.1 m (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. These wires will be used to fabricate the passenger deployment harness.
  60. Strip 13 mm (0.5 in) of insulation from both ends of the wires.
  61. Twist together one end from each of the wires in order to short the wires.
  62. Fig 23: Twisting Connector Wire Leads (High Circuits) To Deployment Harness Wire
    GM566918Courtesy of GENERAL MOTORS CORP.
  63. Twist together the 2 connector wire leads from the high circuits from both stages of the I/P module to one set of deployment wires. Refer to SIR Connector End Views  in order to determine the correct circuits.
  64. Inspect that the 3-wire connection is secure.
  65. Fig 24: Bending Twisted Connection Flat
    GM566922Courtesy of GENERAL MOTORS CORP.
  66. Bend flat the twisted connection.
  67. Fig 25: Insulating Connection With Electrical Tape
    GM566927Courtesy of GENERAL MOTORS CORP.
  68. Secure and insulate the 3-wire connection to the deployment harness using electrical tape.
  69. Fig 26: Twisting Connector Wire Leads (Low Circuits) To Deployment Harness Wire
    GM566932Courtesy of GENERAL MOTORS CORP.
  70. Twist together the 2 connector wire leads from the low circuits from both stages of the I/P module to one set of deployment wires. Refer to SIR Connector End Views  in order to determine the correct circuits.
  71. Inspect that the 3-wire connection is secure.
  72. Fig 27: Bending Twisted Connection Flat
    GM566936Courtesy of GENERAL MOTORS CORP.
  73. Bend flat the twisted connection.
  74. Fig 28: Insulating Connection With Electrical Tape
    GM566942Courtesy of GENERAL MOTORS CORP.
  75. Secure and insulate the 3-wire connection to the deployment harness using electrical tape.
  76. Fig 29: CPA & I/P Module Connector
    GM1244712Courtesy of GENERAL MOTORS CORP.
  77. Connect the deployment harness to the I/P module in-line connector.
  78. Fig 30: I/P Module In-Line Connector Deployment Harness Routed Out Of Passenger Side Of Vehicle
    GM1332556Courtesy of GENERAL MOTORS CORP.
  79. Route the deployment harness out of the passenger side of the vehicle.
  80. Fig 31: Locating CPA & Roof Rail Module Connector
    GM1244657Courtesy of GENERAL MOTORS CORP.
  81. Disconnect the yellow harness connector to the right roof rail air bag from the vehicle harness connector.
  82. Fig 32: Identifying Proper Stripping Of Connection Wire Leads
    GM68649Courtesy of GENERAL MOTORS CORP.
  83. Cut the harness connector out of the vehicle, leaving at least 16 cm (6 in) of wire at the connector.
  84. Strip 13 mm (0.5 in) of insulation from each of the connector wire leads.
  85. Fig 33: Fabricating 20 Ft. Deployment Harness
    GM68651Courtesy of GENERAL MOTORS CORP.
  86. Cut two 6.1 m (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. These wires will be used to fabricate the roof rail air bag deployment harness.
  87. Strip 13 mm (0.5 in) of insulation from both ends of the wires.
  88. Twist together one end from each of the wires in order to short the wires.
  89. Fig 34: View Of Proper Twisting Of Connector Wire Lead To Deployment Wire
    GM68652Courtesy of GENERAL MOTORS CORP.
  90. Twist together one connector wire lead to one deployment wire.
  91. Fig 35: Bending Twisted Connection Flat & Insulating With Tape
    GM68660Courtesy of GENERAL MOTORS CORP.
  92. Bend flat the twisted connection.
  93. Secure and insulate the connection using electrical tape.
  94. Fig 36: Taping Remaining Connector Wire Lead To Remaining Deployment Wire
    GM68662Courtesy of GENERAL MOTORS CORP.
  95. Twist together, bend, and tape the remaining connector wire lead to the remaining deployment wire.
  96. Fig 37: Locating CPA & Roof Rail Module Connector
    GM1244657Courtesy of GENERAL MOTORS CORP.
  97. Connect the deployment harness to the roof rail module yellow connector.
  98. Fig 38: Roof Rail Module Yellow Connector Deployment Harness Routed Out Of Passenger Side Of Vehicle
    GM1332558Courtesy of GENERAL MOTORS CORP.
  99. Route the deployment harness out of the passenger side of the vehicle.
  100. Fig 39: Passenger Side Deployment Harness & Power Source
    GM1332559Courtesy of GENERAL MOTORS CORP.
  101. Completely cover the windshield and the front door window openings with a drop cloth.
  102. Stretch to the full length all of the deployment harness wires on the passenger side of the vehicle.
  103. Deploy each deployment loop one at a time.
  104. Place a power source, 12 V minimum / 2 A minimum, such as a vehicle battery, near the shorted end of the harnesses.
  105. Separate one set of wires and touch the wire ends to the power source in order to deploy the selected inflator module.
  106. Disconnect the deployment harness from the power source and twist the wire ends together.
  107. Continue the same process with the remaining deployment harnesses.
  108. Fig 40: Driver Side Deployment Harness & Power Source
    GM1332561Courtesy of GENERAL MOTORS CORP.
  109. Stretch to the full length all of the deployment harness wires on the driver side of the vehicle.
  110. Deploy each deployment loop one at a time.
  111. Place a power source, 12 V minimum / 2 A minimum, such as a vehicle battery, near the shorted end of the harnesses.
  112. Separate one set of wires and touch the wires ends to the power source in order to deploy the selected inflator modules.
  113. Disconnect the deployment harness from the power source and twist the wire ends together.
  114. Continue the same process with the remaining deployment harnesses.
  115. Remove the drop cloth from the vehicle.
  116. Disconnect all harnesses from the vehicle.
  117. Discard the harnesses.
  118. Scrap the vehicle in the same manner as a non-SIR equipped vehicle.
  119. If one or all of the inflator modules did not deploy, perform the following steps to remove the undeployed modules from the vehicle: