LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2002 >> Blazer 4D Utility, 4WD, Part Time >> Repair and Diagnosis >> External Pages >> Different car >> Section 1505 (Battery, Charging System & Starting System) >> Description and Operation >> Starting System Description and Operation >> Circuit Description

Circuit Description

WARNING: This page is about a different car, the 2004 Chevrolet Corvette. However, it is still accessible from the selected car via links, so may be relevant.

Moving the ignition switch to the START position sends a 12 V signal to the PCM Ignition Crank Sense. The PCM verifies that the transmission is in the PARK or NEUTRAL position. The PCM then grounds the control circuit of the START relay. When the START relay is energized it allows voltage to the starter solenoid S terminal.