LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2002 >> Blazer 4D Utility, 4WD, Part Time >> Repair and Diagnosis >> External Pages >> Different car >> Section 1391 (Frame & Underbody) >> Repair Instructions >> Assist Step Replacement (Z-71) >> Installation Procedure

Installation Procedure

WARNING: This page does not describe the selected car, but rather 7 other vehicles, including the 2002 GMC Yukon XL, 2002 GMC Yukon, 2002 Chevrolet Tahoe, 2002 Chevrolet Suburban, and 2002 Chevrolet Avalanche. However, it is still accessible from the selected car via links, so may be relevant.
    Fig 1: Installing Brackets & Rivets
    GM756541Courtesy of GENERAL MOTORS CORP.
  1. Install the rocker panel molding bracket (4) to the vehicle.
  2. Install the rivets (3) that secure the rocker panel molding bracket (4) to the vehicle.
  3. Install the assist step brackets (5) to the vehicle.
  4. NOTE: Refer to FASTENER NOTICE .
  5. Install the 5 retaining bolts (1) to the inner side of the rocker panel.

    Tighten:  Tighten the bolts (1) to 29 N.m (21 lb ft).

  6. Install the 5 retaining bolts (2) to the inner side of the rocker panel.

    Tighten:  Tighten the bolts (1) to 10 N.m (89 lb in).

  7. Fig 2: Installing Stud Plates & Step Brackets
    GM756547Courtesy of GENERAL MOTORS CORP.
  8. Install the 5 stud plates (1) to the 5 assist step brackets (2).
  9. Fig 3: Installing Rivets To Secure Assist Step Brackets To Rocker Panel
    GM756551Courtesy of GENERAL MOTORS CORP.
  10. Install the rivets (1) that secure the assist step brackets to the rocker panel.
  11. Install the rocker panel molding. Refer to MOLDING REPLACEMENT - ROCKER PANEL (Z-71) or MOLDING REPLACEMENT - ROCKER PANEL (UTILITY)
  12. Fig 4: Installing Spacers & Nuts
    GM756539Courtesy of GENERAL MOTORS CORP.
  13. With the aid of an assistant, install the assist step to the vehicle.
  14. Install the spacers and the nuts (1).

    Tighten:  Tighten the bolts (1) to 29 N.m (21 lb ft).