Installation Procedure
WARNING: This page is about a different car, the 2004 Pontiac Vibe. However, it is still accessible from the selected car via links, so may be relevant.
- Install the I/P reinforcement (4) to the vehicle. Secure the reinforcement with the following fasteners:
- The 7 bolts
- The 1 nut
Tighten: Tighten the instrument panel reinforcement bolts and nuts to 28 N.m (21 lb ft).
- Reroute harness through the I/P reinforcement.
- Install the windshield defroster nozzle duct to the heater case assembly.
- Install the I/P center support braces. Refer to Bracket Replacement - Instrument Panel (I/P) Center Support .
- Install the ground cable.
- Install the instrument panel pad lower (11) to the carrier support (4) and secure the lower pad with the bolts (12).
- Connect the wire harness clamps.
- Install the lower I/P panel. Refer to Instrument Panel (I/P) Trim Panel Replacement - Lower .
- Install the upper I/P panel. Refer to Trim Pad Replacement - Instrument Panel (I/P) Upper .
NOTE:
Refer to Fastener Notice in Cautions and Notices.