Installation Procedure
WARNING: This page is about a different car, the 2003 Chevrolet Corvette. However, it is still accessible from the selected car via links, so may be relevant.
- Insert the floor air outlet duct - RH rear up between the IP center support bracket and the side of the driveline tunnel, then position the duct to the HVAC module.
- Align the floor duct to the HVAC module, then push firmly and evenly to secure the duct.
- Position and secure the floor air outlet lower duct - RH rear to the floor air outlet duct - RH rear.
Use a twisting motion to secure the lower duct to the duct.
- Secure the floor air outlet - inner to the floor air outlet lower duct - RH rear.
Use a twisting motion to secure the floor outlet to the floor duct.
- Position the front floor carpet to the RH side of the driveline tunnel.
- Install the IP upper trim pad. Refer to TRIM PAD REPLACEMENT - INSTRUMENT PANEL (I/P) UPPER in Instrument Panel, Gages and Console.