Installation Procedure
WARNING: This page is about a different car, the 2004 Pontiac Aztek and 2004 Buick Rendezvous. However, it is still accessible from the selected car via links, so may be relevant.
- Lightly coat the O-ring with mineral base 525 viscosity refrigerant oil.
- Install the service port.
Tighten: Tighten the service port to 11 N.m (98 lb in).
- Evacuate and recharge the A/C system. Refer to Refrigerant Recovery and Recharging .
- Leak test the fittings of the component using J 39400-A .
- Install the service port cap.
Tighten the cap 1/4-1/2 turn after the seal washer contacts to access fitting.
IMPORTANT:
DO NOT allow any of the mineral base 525 viscosity refrigerant oil on the new O-ring to enter the refrigerant system.
NOTE:
Refer to Fastener Notice in Cautions and Notices.