LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2002 >> Blazer 4D Utility, 4WD, Part Time >> Repair and Diagnosis >> External Pages >> Different car >> Section 1040 (Rear Drive Axle) >> Repair Instructions >> Differential Side Bearing Preload Adjustment (8.6 Inch Axle) >> Wedge Method >> Notes

Wedge Method: Notes

WARNING: This page is about a different car, the 2004 GMC Sierra, 2004 GMC Cab & Chassis Sierra, 2004 Chevrolet Silverado, and 2004 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.

Tools Required

IMPORTANT:
  • The differential side bearing preload adjustment must be completed before the backlash adjustment can be started.
  • In order to maintain the original backlash, adjust the differential case side bearing preload by changing the thickness of the left and the right side shim packs equally.
  • Measure the service shims and the spacers one at a time. Add the measurements together in order to obtain the total thickness of the left or the right side shim pack.
  • Do not use or reuse the original cast iron production shims. Use service shims and spacers instead.
  1. Install the drive pinion, if necessary. Refer to Drive Pinion and Ring Gear Replacement (8.6 Inch, 9.5 Inch, 11.5 Inch Axles)  or Drive Pinion and Ring Gear Replacement (9.75 Inch Axle)  or Drive Pinion and Ring Gear Replacement (10.5 Inch Axle) .
  2. Measure the rotating torque of the drive pinion using an inch-pound torque wrench. Record the measurement.

    Specification:  The rotating torque of the drive pinion should be 1.7-3.4 N.m (15-30 lb in) for new bearings or 1.1-2.3 N.m (10-20 lb in) for used bearings.

  3. If the rotating torque for the drive pinion bearings is not within specifications, adjust as necessary. Refer to Drive Pinion and Ring Gear Replacement (8.6 Inch, 9.5 Inch, 11.5 Inch Axles)  or Drive Pinion and Ring Gear Replacement (9.75 Inch Axle)  or Drive Pinion and Ring Gear Replacement (10.5 Inch Axle) .
  4. IMPORTANT: Before installation of the differential assembly, ensure that the differential side bearing surfaces in the axle housing are clean and free of burrs. If the original differential side bearings are to be reused, the original differential side bearing cups must also be used.
  5. Install the differential assembly with the differential side bearings and differential side bearing cups into the axle housing.
  6. Insert one 4.318 mm (0.170 in) thick service spacer into the left side of the axle housing.
  7. Side the differential assembly towards the service spacer in order to hold the spacer in place.
  8. Install the J 22779  into the right side of the axle housing.

    The J 22779  must be installed between the service spacer and the differential side bearing cup.

  9. IMPORTANT: Over-tightening of the J 22779  may spread the housing and result in incorrect shim selection.
  10. Tighten the knob on the J 22779  until there is moderate drag when the J 22779  is moved.
  11. Remove the J 22779  .
  12. Remove the service spacer.
  13. Using a micrometer, measure the thickness of the service spacer. Record the measurement.
  14. Using a micrometer, measure the thickness of the J 22779  in 3 locations. Calculate the average of the 3 measurements. Record the measurement.
  15. Add the thickness of the service spacer, measured in Step 11 to the average thickness of the J 22779  , measured in Step 12. The resulting value is the total service shim thickness without preload for the axle.
  16. Insert one BENT 1.016 mm (0.040 in) service shim between the right side differential side bearing cup and the axle housing. The service shim must be installed between the service spacer and the differential side bearing cup.
  17. Install the J 22779  into the left side of the axle housing. The J 22779  must be installed between the service spacer and the differential side bearing cup.
  18. While rotating the ring gear back and forth, tighten the knob on the J 22779  until there is approximately 0.025-0.051 mm (0.001-0.002 in) of backlash between the ring gear and the drive pinion.
  19. Once the correct amount of backlash is obtained, remove the J 22779  .
  20. Remove the differential assembly with the differential side bearings and the differential side bearing cups.
  21. Remove the BENT service shim.
  22. Using a micrometer, measure the thickness of the J 22779  in 3 locations. Calculate the average of the 3 measurements. This value is the left side service shim thickness without preload.
  23. In order to determine the right side service shim thickness, subtract the service shim thickness for the left side of the axle, calculated in step 20, from the total service shim thickness, calculated in step 13. This value is the service shim thickness for the right side of the axle without preload.
  24. In order to preload of the differential side bearings and set the backlash to approximately 0.127-0.223 mm (0.005-0.009 in), take the value determined in step 21 and add 0.203 mm (0.008 in) service shim thickness to this amount.
  25. Assemble the left side shim pack using one 4.318 mm (0.170 in) service spacer and the appropriate amount of service shims equaling the thickness determined in step 20. Measure the service spacer and the service shims separately. Add the measurements together in order to determine the total shim pack thickness.
  26. Assemble the right side shim pack using one 4.318 mm (0.170 in) service spacer and the appropriate amount of service shims equaling the thickness determined in step 22. Measure the service spacer and the service shims separately. Add the measurements together in order to determine the total shim pack thickness.
  27. Install the differential assembly with the differential side bearings and the differential side bearing cups.
  28. Install the left side service spacer and service shim into the axle housing. The service shim must be installed between the service spacer and the differential side bearing cup.
  29. Install the right side service spacer between the axle housing and the differential side bearing cup.
  30. Install the right side service shim into the axle housing using the J 25588  , if necessary. The service shim must be installed between the service spacer and the differential side bearing cup.
  31. NOTE: Refer to Fastener Notice in Cautions and Notices.
  32. Install the differential bearing caps and the bolts.

    Tighten:  Tighten the differential bearing cap bolts to 75 N.m (55 lb ft).

  33. Rotate the pinion several times to ensure the drive pinion and differential side bearings have seated.
  34. Measure the rotating torque of the drive pinion and differential side bearings using an inch-pound torque wrench. Record the measurement.

    Specification:  The rotating torque of the drive pinion and differential side bearings should be approximately 3.9-6.2 N.m (30-55 lb in) for new bearings or 2.8-5.1 N.m (25-45 lb in) for used bearings.

  35. Calculate the differential side bearing preload by subtracting the drive pinion preload, measured in Step 2, from the drive pinion and differential case bearing preload, measured in Step 33. Multiply the value obtained by the axle ratio.

    Specification:  The differential side bearing preload should be 1.7-4.0 N.m (15-35 lb in).

  36. If the differential side bearing preload is not within specifications, add or subtract shim thickness equally from each shim pack as necessary in order to increase/decrease the side bearing preload.
  37. Once the differential side bearing preload is correct, measure the backlash and adjust, if necessary. Refer to Backlash Adjustment (8.6 Inch Axle)  or Backlash Adjustment (9.75 Inch Axle) .
  38. Once the differential side bearing preload and backlash is correct, perform a gear tooth contact pattern check in order to ensure proper alignment between the ring and pinion gears. Refer to Gear Tooth Contact Pattern Inspection .