Installation Procedure
WARNING: This page is about a different car, the 2004 GMC Sierra, 2004 GMC Cab & Chassis Sierra, 2004 Chevrolet Silverado, and 2004 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
- Install the oil feed pipe and NEW sealing washers.
- Each end of the oil feed pipe has different bend angles.
- Ensure the 90 degree bend is towards the turbocharger.
- Align the pipe as shown to clear the turbocharger lower heat shield.
- Install the oil feed pipe bolt.
Tighten: Tighten the bolt to 34 N.m (25 lb ft).
- Install the turbocharger. Refer to Turbocharger Replacement .
IMPORTANT:
Lubricate the NEW sealing washers with diesel fuel before installing.
NOTE:
Refer to Fastener Notice in Cautions and Notices.