Installation Procedure
WARNING: This page is about a different car, the 2004 GMC Sierra, 2004 GMC Cab & Chassis Sierra, 2004 Chevrolet Silverado, and 2004 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
- Install the right side idler pulley and bolt (1).
Tighten: Tighten the bolt to 50 N.m (37 lb ft).
- Install the center idler pulley and bolt (2).
Tighten: Tighten the bolt to 50 N.m (37 lb ft).
- If equipped with dual generators, install the left side idler pulley and bolt.
Tighten: Tighten the bolt to 50 N.m (37 lb ft).
- Install the drive belt. Refer to Drive Belt Replacement .
NOTE:
Refer to Fastener Notice
in Cautions and Notices.