LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2002 >> Blazer 4D Utility, 4WD, Part Time >> Repair and Diagnosis >> External Pages >> Different car >> Section 1018 (Engine Mechanical - 4.3L) >> Repair Instructions >> Off-Vehicle Repair Instructions >> Piston, Connecting Rod, and Bearing Removal

Piston, Connecting Rod, and Bearing Removal

WARNING: This page is about a different car, the 2004 GMC Sierra and 2004 Chevrolet Silverado. However, it is still accessible from the selected car via links, so may be relevant.

Tools Required

  1. Use the J 24270  in order to remove the cylinder ring ridge.
    1. Turn the crankshaft until the piston is at the bottom of the stroke.
    2. Place a cloth on top of the piston.
    3. Use the J 24270  to remove all of the cylinder ring ridge.
    4. Turn the crankshaft so the piston is at the top of the stroke.
    5. Remove the cloth.
    6. Remove the cutting debris.
  2. Fig 1: Removing Cylinder Bore Ring Ridge
    GM11497Courtesy of GENERAL MOTORS CORP.
    IMPORTANT: Place matchmarks or numbers on the connecting rods and the connecting rod caps.
  3. Remove the connecting rod nuts.
  4. Remove the connecting rod cap.
  5. Fig 2: Removing Connecting Rod Nut & Cap
    GM480549Courtesy of GENERAL MOTORS CORP.
  6. Use the J 5239  in order to protect the crankshaft journals and remove the connecting rod and the piston out of the top of the engine block.
  7. Fig 3: Protecting Crankshaft Journals Using J 5239
    GM31373Courtesy of GENERAL MOTORS CORP.
    IMPORTANT: Always assemble the connecting rod caps to the matching connecting rods.
  8. Remove the connecting rod bearings.
    • Keep the connecting rod bearings with the original connecting rod and connecting rod cap.
    • Wipe the oil from the connecting rod bearings.
    • Wipe the oil from the crankpins.
  9. Fig 4: Connecting Rods
    GM188017Courtesy of GENERAL MOTORS CORP.