Test Description
WARNING: This page is about a different car, the 2003 Saturn Vue. However, it is still accessible from the selected car via links, so may be relevant.
The numbers below refer to the step numbers on the diagnostic table.
- 2: This step verifies the ability of the TCM to command the shift PC solenoid valve.
- 3: This step verifies that the automatic transmission wiring harness and the shift PC solenoid valve have correct resistance.
DTC P0970
| Step | Action | Values | Yes | No |
|---|---|---|---|---|
| 1 | Did you perform the Diagnostic System Check - Engine Controls? | - | Go to Step 2 | Go to DIAGNOSTIC SYSTEM CHECK -- ENGINE CONTROLS |
| 2 |
IMPORTANT:
|
0.05 amps | Go to Step 3 | Go to INTERMITTENTS |
| 3 |
|
3.8-8.3 ohm | Go to Step 7 | Go to Step 4 |
| 4 | Is the resistance greater than the specified value? | 8.3 ohm | Go to Step 5 | Go to Step 6 |
| 5 |
|
- | Go to Step 18 | Go to Step 19 |
| 6 | Test the high control circuit (CKT 2880) and the low control circuit (CKT 5508) of the shift PC solenoid valve for being shorted together between the AT inline 14-way connector and the shift PC solenoid valve. Refer to Testing for Continuity in Wiring Systems. Did you find the condition? |
- | Go to Step 18 | Go to Step 19 |
| 7 | Measure the resistance from terminal 9 of the transmission side of the AT inline 14-way connector to ground. Is the resistance less than the specified value? |
10 ohm | Go to Step 8 | Go to Step 9 |
| 8 |
|
- | Go to Step 18 | Go to Step 19 |
| 9 | Measure the resistance between terminal 9 and all other terminals, except terminal 2, of the transmission side of the AT inline 14-way connector. Is the resistance between terminal 9 and any other terminal, except terminal 2, less than the specified value? |
100 ohm | Go to Step 18 | Go to Step 10 |
| 10 |
|
10 ohm | Go to Step 11 | Go to Step 12 |
| 11 | Test the low control circuit (CKT 1229) of the shift PC solenoid for a short to ground between the TCM connector and the AT inline 14-way connector. Refer to Testing for Short to Ground and Wiring Repairs in Wiring Systems. Did you find and correct the condition? |
- | Go to Step 21 | - |
| 12 | Using the DMM and the J-35616
GM-approved terminal test kit, measure the resistance between terminal 2 of the harness side of the AT inline 14-way connector and terminal 36 of the TCM C2 connector. Is the resistance less than the specified value? |
10 ohm | Go to Step 14 | Go to Step 13 |
| 13 | Test the low control circuit (CKT 5508) of the shift PC solenoid valve for an open between the TCM connector and the AT inline 14-way connector. Refer to Testing for Continuity andWiring Repairs in Wiring Systems. Did you find and correct the condition? |
- | Go to Step 21 | - |
| 14 | Using the DMM and the J-35616
GM-approved terminal test kit, measure the resistance from terminal 9 of the harness side of the AT inline 14-way connector to ground. Is the resistance less than the specified value? |
10 ohm | Go to Step 15 | Go to Step 16 |
| 15 | Test the high control circuit (CKT 2880) of the shift PC solenoid valve for a short to ground between the TCM connector and the AT inline 14-way connector. Refer to Testing for Short to Ground and Wiring Repairs in Wiring Systems. Did you find and correct the condition? |
- | Go to Step 21 | - |
| 16 | Using the DMM and the J-35616
GM-approved terminal test kit, measure the resistance between terminal 9 of the harness side of the AT inline 14-way connector and terminal 26 of the TCM connector. Is the resistance less than the specified value? |
10 ohm | Go to Step 20 | Go to Step 17 |
| 17 | Test the high control circuit (CKT 2880) of the shift PC solenoid valve for an open between the TCM connector and the AT inline 14-way connector. Refer to Testing for Continuity
and Wiring Repairs
in Wiring Systems. Did you find and correct the condition? |
- | Go to Step 21 | - |
| 18 | Replace the automatic transmission wiring harness. Refer to Wiring Harness Removal
. Is the action complete? |
- | Go to Step 21 | - |
| 19 | Replace the control valve body assembly. Refer to Control Valve Body Replacement
. Is the action complete? |
- | Go to Step 21 | - |
| 20 | Replace the TCM. Refer to Transmission Control Module (TCM) Replacement
. Is the action complete? |
- | Go to Step 21 | - |
| 21 | Perform the following procedure in order to verify the repair:
Does the DTC reset? |
- | Go to Step 2 | Go to Step 22 |
| 22 | With the scan tool, observe the stored information, capture info and DTC info. Does the scan tool display any DTCs that you have not diagnosed? |
- | Go to DIAGNOSTIC TROUBLE CODE DEFINITIONS | System OK |