LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2001 >> Venture Base, Van Passenger >> Repair and Diagnosis >> External Pages >> Different car >> Section 515 (Engine Mechanical - 2.2L (LN2)) >> Repair Instructions >> Off-Vehicle Repair Instructions >> Piston and Connecting Rod Assemble

Piston and Connecting Rod Assemble

WARNING: This page is about a different car, the 2003 GMC Sonoma and 2003 Chevrolet S10 Pickup. However, it is still accessible from the selected car via links, so may be relevant.

Tools Required 

J 24086-C  Piston Pin Remover/Installer Set

  1. Place the piston and connecting rod into the J 24086-C 

    Important:  Ensure that the arrow on top of the piston faces towards the front of the engine  .

  2. Orient the connecting rod in the piston.
  3. Examine the lower end of the connecting rod.
  4. Locate the bump on the connecting rod lower end.
  5. This bump is at the top of the large end where it forms the connecting rod beam.
  6. Orient the connecting rod so that the bump faces away from the arrow on top of the piston.
    Fig 1: Removing Piston Pin
    G01977170Courtesy of GENERAL MOTORS CORP.
  7. With the connecting rod in this position, the tab on the connecting rod cap faces the front of the engine.
  8. Coat the piston pin with clean engine oil.
  9. Press the piston pin into place.
  10. Inspect the piston for freedom of movement.
  11. Install the following parts of the oil control ring assembly:
    • The expander
    • The lower oil control ring
    • The upper oil control ring
    NOTE: Use a piston ring expander to install the piston rings. The rings may be damaged if expanded more than necessary.
    Fig 2: Pressing Piston Pin Into Place
    G01977171Courtesy of GENERAL MOTORS CORP.

    Important:  In order to provide an effective compression seal, the ring gaps must be staggered.

  12. Install the second compression ring with the manufacturer's mark facing up.
  13. Install the top compression ring, it can be installed with either side facing up.