LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2001 >> Venture Base, Van Passenger >> Repair and Diagnosis >> External Pages >> Different car >> Section 297 (Engine Controls - Removal & Installation - V6 & V8) >> Air Induction Systems >> Supercharger >> Installation

Air Induction Systems: Supercharger: Installation

WARNING: This page is about a different car, the 2003 Pontiac Grand Prix, 2003 Chevrolet Monte Carlo, 2003 Chevrolet Impala, 2003 Buick Regal, and 2003 Buick Century. However, it is still accessible from the selected car via links, so may be relevant.
  1. Install the new supercharger gasket. Do not use any sealer on the gasket. Install the supercharger to the intake manifold.
  2. Install the supercharger mounting bolts. See TORQUE SPECIFICATIONS .
  3. Position a new throttle body gasket to the supercharger. Install the throttle body to the supercharger. Install the nuts securing the throttle body to the supercharger. Tighten throttle body nuts, see TORQUE SPECIFICATIONS . Install the air cleaner intake duct. Install boost control solenoid. See BOOST CONTROL SOLENOID  under RELAYS & SOLENOIDS.
  4. Install the MAP sensor bracket. Install the MAP sensor connector and hose. Install the fuel rail assembly. See FUEL RAIL & INJECTORS  under FUEL SYSTEMS.
  5. Position the engine wiring harness heat shield to the engine. Install the engine wiring harness heat shield fasteners. See TORQUE SPECIFICATIONS . Connect the right side plug wires to the ignition module.
  6. Install the generator brace and fasteners. See TORQUE SPECIFICATIONS . Install the EVAP canister purge valve. Connect the vacuum brake booster hose to the vacuum connections. Install the supercharger belt. Install battery. Install the fuel injector sight shield.