LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2001 >> Venture Base, Van Passenger >> Repair and Diagnosis >> External Pages >> Different car >> Section 225 (Automatic Transmission Servicing) >> Lubrication >> Oil Cooler Flushing >> Back Flush

Back Flush

WARNING: This page is about a different car, the 2003 Pontiac Montana, 2003 Oldsmobile Silhouette, and 2003 Chevrolet Venture. However, it is still accessible from the selected car via links, so may be relevant.
  1. Inspect the transaxle oil cooler pipes for kinks or damage. Repair as necessary.
  2. Connect the transaxle oil cooler and line flusher to the oil cooler feed top connector.
  3. Clip the discharge hose (5) onto the oil drain container. See Fig 1 .
  4. Attach the transaxle oil cooler and line flusher to the undercarriage of the vehicle with the hook provided and connect the flushing system feed supply hose (3) from the transaxle oil cooler and line flusher to the bottom connector oil cooler return pipe.
  5. Turn the transaxle oil cooler and line flusher water supply valve (1) to the ON position and allow water to flow through the oil cooler and pipes for 10 seconds to remove any remaining transaxle fluid. If water does not flow through the oil cooler and pipes, the cause of the blockage must be diagnosed and the plugged component must be repaired or replaced. Continue with the cooler flushing and flow check procedure once the blockage is corrected.
  6. Turn the transaxle oil cooler and line flusher water supply valve (8) to the OFF position and clip the discharge hose onto a 5 gallon pail with a lid, to avoid splashback.
    NOTE: Flushing for approximately 2 minutes in each cooler line direction will result in a total of about 8-10 gallons of waste fluid. This mixture of water and flushing fluid is to be captured in a bucket or similar container.
  7. Turn the transaxle oil cooler and line flusher water supply valve (1) to the ON position and depress the trigger (8) to mix cooler flushing solution into the water flow. Use the clip provided on the handle to hold the trigger (8) down. The discharge will foam vigorously when the solution is introduced into the water stream. See Fig 2 .
  8. Flush the oil cooler and pipes with water and solution for 2 minutes. During this flush, attach the shop air supply 120 psi (825 kPa) to the flushing system feed air valve (2) located on the transaxle oil cooler and line flusher, for 3-5 seconds at the end of every 15-20 second interval to create a surging action.
  9. Release the trigger (8) and turn the transaxle oil cooler and line flusher water supply valve (1) to the OFF position.
Fig 1: Connecting Flushing Equipment
G00056983Courtesy of GENERAL MOTORS CORP.
Fig 2: Flushing Oil Cooling System
G00056984Courtesy of GENERAL MOTORS CORP.