Cylinder Head: Notes
NOTE:
Place valve train parts in a rack to ensure installation in same location from which they were removed. Intake push rod are 5.68" (144.18 mm) long, and exhaust push rods are 6.0" (152.51 mm) long. If only removing rocker arms and push rods, DO NOT remove lower intake manifold.