Wheel Cylinder: Remove, Install, and Overhaul
WARNING: This page is about the RV Cutaway 5.7 R, L31/KL8, which is a different variant/trim than selected.
Includes: Repack Wheel Bearings (where applicable), bleed System and replace Shoes (if necessary).| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| Rear,Full Floating Axle,Both | 2.8 | 2.0 | B | |
| Rear,Full Floating Axle,One Side | 1.5 | 1.2 | B | |
| Rear,Semi-Floating Axle,Both | 2.2 | 1.3 | B | |
| Rear,Semi-Floating Axle,One Side | 1.2 | 1.0 | B | |
| Additional Procedure: WHEEL CYLINDER: Remove, Install, and Overhaul: | ||||
| w/4-Wheel ABS,add | 1.0 | B | ||
| w/Dual Rear Wheels add, Each Side | 0.1 | B | ||