Installation Procedure
WARNING: This page is about a different car, the 2004 Pontiac Sunfire and 2004 Chevrolet Cavalier. However, it is still accessible from the selected car via links, so may be relevant.
IMPORTANT:
When installing a new park/lock cable, keep the shipping cover gauge attached until you are instructed to detach it. The shipping cover gauge will aid in the proper positioning of the cable.
- Ensure that the cable lock button is in the up position. Place the shift lever in the PARK position.
- Snap the control cable connector into the automatic transmission control.IMPORTANT: Do not insert the cable with the key in any position other than the RUN position.
- Place the ignition key in the RUN position.
- Snap the control cable into the inhibitor housing until the snap lock is seated.
- Remove the shipping cover gauge.
- Turn the key to the LOCK position.
- Snap the control cable end onto the shift park/lock lever pin.
- Push the cable connector hose forward in order to remove any slack.IMPORTANT: Inspect for proper operation of the park/lock control cable before installing the steering column to the instrument panel.
- With no load applied to the connector nose, snap the cable connector lock button down.
- Raise and connect the steering column.
- Tighten the lower steering column bracket bolts.
- Install the knee bolster.
- Install the console. Refer toConsole Replacement - Front Floor in Instrument Panel, Gages and Console
- Connect the negative battery cable. Refer to Battery Negative Cable Disconnect/Connect Procedure in Engine Electrical.