LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 1990 >> Step Van 7.4 N, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 14 (Drive Axle - 7.5", 7.625", 8.5" & 9.5") >> Overhaul >> Reassembly & Adjustments >> Side Bearing Preload (9 1/2" Ring Gear)

Side Bearing Preload (9 1/2" Ring Gear)

WARNING: This page does not describe the selected car, but rather 20 other vehicles, including the 1990 GMC Vandura Special, 1990 GMC Vandura, 1990 GMC Safari, 1990 GMC S15 Pickup, and 1990 GMC S15 Jimmy. However, it is still accessible from the selected car via links, so may be relevant.
  1. Differential side bearing preload is adjusted by adjusting nut in differential bearing bore (right side). The bore and bearing cap provide the mating threads for the bearing nut. Install bearing cups to differential bearings in original locations.
  2. Install differential case into axle housing assembly. Install bearing shims. Push case away from pinion towards axle housing and install adjusting nut. Tighten nut with Spanner Wrench (J-2429). Turn pinion to seat bearings.
  3. Back off adjusting nut. Install bearing caps and bolts loosely in their original positions. Turn adjusting nut until nut contacts shim. Tighten nut 3 additional slots.
  4. Tighten bearing cap bolts to specifications. Install adjusting nut lock bolt. Tighten to specification. Check backlash adjustment. See BACKLASH & FINAL ASSEMBLY  in this article.