Installation Procedure
WARNING: This page is about a different variant/trim than selected.
Ensure the 2 cylinder head locating pins (5) are securely mounted in the engine block deck face.
- Install a NEW cylinder head gasket (4) using the deck face locating pins for retention.
- Cylinder Head (3) - Install
- CAUTION:
Refer to Fastener Caution .
CAUTION:This vehicle is equipped with torque-to-yield or single use fasteners. Install a NEW torque-to-yield or single use fastener when installing this component. Failure to replace the torque-to-yield or single use fastener could cause damage to the vehicle or component.
Cylinder Head Bolt M8 x 80.8 (3) - Install NEW and tighten in sequence [ 2x ]
- First Pass: 15 N.m (11 lb-ft)
- Final Pass: 75 degrees
- Cylinder Head Bolt M11 x 178 (4) - Install NEW and tighten in sequence [ 8x ]
- First Pass: 60 N.m (44 lb-ft)
- Final Pass: 185 degrees
Camshaft Carrier-Left Side (2) - Install - Camshaft Carrier Resealing - Left Side
- Camshaft-Left Side - Install - Camshaft Replacement - Left Side
- Oil Level Indicator Tube - Install - Oil Level Indicator Tube Replacement
- Compressor Air Intake Turbocharger-Left Side - Install - Compressor Air Intake Turbocharger Replacement - Left Side
- Fuel Feed Intermediate Pipe - Install - Fuel Feed Intermediate Pipe Replacement
Fuel Injection Fuel Rail Noise Shield (1) - Install - Fuel Injection Fuel Rail Noise Shield Replacement (Upper) , or Fuel Injection Fuel Rail Noise Shield Replacement (Lower)
- Camshaft Timing Chain-Left Side - Install - Camshaft Timing Chain Assembly Replacement - Left Side
- Engine - Install - Engine Replacement (AWD) , or Engine Replacement (RWD)