Installation Procedure
NOTE:
All gasket surfaces should be free of oil or other foreign material during assembly.
- Install a NEW gasket (1) on the valve lifter oil manifold.
- Set the valve lifter oil manifold (2) onto the engine.
- Install the valve lifter oil manifold bolts (3).
Tighten
- First pass in sequence 15 N.m (11 lb ft).
- Final pass in sequence 30 N.m (22 lb ft).
- Connect the two electrical connectors (1).
- Install the fuel injection fuel rail assemblies. Refer to Fuel Injection Fuel Rail Assembly Replacement - Bank 1 , and Fuel Injection Fuel Rail Assembly Replacement - Bank 2 .
- Install the fuel pump. Refer to Fuel Pump Replacement .