Circuit/System Testing
NOTE:
- Circuit/System Verification must be performed before proceeding with Circuit/System Testing.
- If equipped, the following tests can be performed at an in-line connector. See schematics for the corresponding terminals to test at.
- Ignition OFF, disconnect the harness connector at the secondary fuel level sensor.
- Ignition ON, scan tool installed, verify that the scan tool Fuel Level Sensor Left Tank parameter is greater than 4.5 V.
- If less than the specified range, test the secondary signal circuit terminal A for a short to ground. If the circuit tests normal, replace the ECM.
- If all circuits test normal, perform the fuel level sensor component test before replacing the secondary fuel level sensor.