Circuit/System Testing
WARNING: This page is about a different variant/trim than selected.
NOTE:
You must perform the Circuit/System Verification before proceeding with Circuit/System Testing.
- Ignition OFF, disconnect the harness connector at the B75B Mass Air Flow/Intake Air Temperature sensor. It may take up to 2 minutes for all vehicle systems to power down.
- Test for less than 2 Ω between the ground circuit terminal B and ground.
- If 2 Ω or greater
- Ignition OFF.
- Test for less than 2 Ω in the ground circuit end to end.
- If 2 Ω or greater, repair the open/high resistance in the circuit.
- If less than 2 Ω, repair the open/high resistance in the ground connection.
- If less than 2 Ω
- Ignition ON, verify a test lamp illuminates between the ignition voltage circuit terminal C and ground.
- If the test lamp does not illuminate and the circuit fuse is good
- Ignition OFF.
- Test for less than 2 Ω in the ignition voltage circuit end to end.
- If 2 Ω or greater, repair the open/high resistance in the circuit.
- If less than 2 Ω, verify the fuse is not open and there is voltage at the fuse.
- If the test lamp does not illuminate and the circuit fuse is open
- Ignition OFF.
- Test for infinite resistance between the ignition voltage circuit and ground.
- If less than infinite resistance, repair the short to ground on the circuit.
- If infinite resistance
- Test for greater than 2 Ω between the ignition voltage circuit terminal C and ground.
- If less than 2 Ω, repair the short to ground on the circuit.
- If greater than 2 Ω, test all the components connected to the circuit and repair or replace as necessary.
- If the test lamp illuminates
- Ignition ON, test for 4.8-5.2 volts between the MAF signal circuit terminal A and ground.
- If less than 4.8 V
- Ignition OFF, disconnect the harness connector at the engine control module.
- Test for infinite resistance between the signal circuit and ground.
- If less than infinite resistance, repair the short to ground on the circuit.
- If infinite resistance
- Test for less than 2 Ω in the signal circuit end to end.
- If 2 Ω or greater, repair the open/high resistance in the circuit.
- If less than 2 Ω, replace the engine control module.
- If greater than 5.2 V
- Ignition OFF, disconnect the harness connector at the engine control module, ignition ON.
- Test for less than 1 V between the signal circuit and ground.
- If 1 V or greater, repair the short to voltage on the circuit.
- If less than 1 V, replace the engine control module.
- If between 4.8-5.2 V
- Ignition OFF, connect the leads of the EN-38522-A
Variable Signal Generator as follows:
- Red lead to the signal circuit terminal A at the harness connector
- Black leads to ground
- Battery voltage supply lead to B+
- Set the EN-38522-A
Variable Signal Generator to the following specifications.
- Signal switch to 5 V
- Frequency switch to 5 KHz
- Duty Cycle switch to Normal
- Engine idling, observe the scan tool MAF Sensor parameter. The scan tool MAF Sensor parameter should be between 4,950-5,050 Hz.
- If not between 4,950-5,050 Hz.
If not between 4,950-5,050 Hz., replace the engine control module.
- If between 4,950-5,050 Hz.
- If not between 4,950-5,050 Hz.
- Test or replace the B75B Mass Air Flow /Intake Air Temperature sensor.