Oil Pump Assembly Installation: Installation
WARNING: This page is about a different car, the 2008 GMC Sierra and 2008 Chevrolet Silverado. However, it is still accessible from the selected car via links, so may be relevant.
- Install the J 25025-1 .
- Remove the J 39855-2 which is part of kit J 39855 . See Special Tools .
- Install the pump to drum thrust washer (601).
- Use J 36850 or equivalent to retain the washer to the pump. See Special Tools .
- Install the pump cover to case gasket (6).
- Install the oil pump assembly (4) into the case and align all holes properly.
- Install the pump to case bolts (2) with new O-ring seals (3).
Tighten: Tighten the bolts to 29 N.m (21 lb ft).
- Remove the J 25025-1 .
- Install the remaining pump to case bolts (2) and O-ring seals (3), in the holes where the J 25025-1
were.
Tighten: Tighten the bolts to 29 N.m (21 lb ft).
IMPORTANT:
The oil pump to case seal is installed after the oil pump assembly, during torque converter installation. Refer to Converter Housing Installation .
NOTE:
Refer to Fastener Notice
.
IMPORTANT:
The pump to case bolt O-ring seals (3) must be replaced.