Connecting Rod Clearance Measurement Procedure - Using J 43690 and J 43690-100
The J 43690 and the J 43690-100 have been developed as a more accurate method to measure connecting rod bearing clearances. The instructions below provide an overview of tool set-up and usage. For more detailed information, refer to the tool instruction sheets as supplied by the tool manufacturer.
J 43690 Rod Bearing Clearance Checking Tool
- J 43690-20 Swivel Base (1)
- J 43690-19 Dial Indicator (2)
- J 43690-2 Base (3)
- J 43690-5, -6 Handle (4)
- J 43690-10, -11 Foot (5)
- 280307 Screw (6)
- J 43690-1 Pivot Arm Assembly (7)
- J 43690-3, -7, -8 Screws (8)
- 280319 Screw (9)
- 280311 Screw (10)
- J 43690-17, -18 Adapter (11)
- 280310 Pin (12)
J 43690-100 Rod Bearing Clearance Tool - Adapter Kit
- J 43690-104 Spacer (1)
- J 43690-105 Retainer Plate (2)
- 505478 Bolt (3)
- 511341 Bolt (4)
- J 43690-106 Retainer Plate (5)
- J 43690-107 Cap (6)
- J 43690-102 Foot (7)
- J 43690-101 Pivot Arm Assembly (8)
- J 43690-103 Adapter (9)
- 505439 Adapter (10)
- Install the connecting rod end cap on its original connecting rod making sure the bearing lock tangs are aligned on the same side of the rod.
- When properly installed, the connecting rod bearing cap notches should be paired, as shown, on the crankpin.
- Lubricate connecting rod bolts with engine oil and install in the connecting rod.
Tighten: Tighten the connecting rod bolts to 30 N.m (22 lb ft).
- Loosen the connecting rod bolts until the torque reading is zero.
- Re-tighten the connecting rod bolts.
- First Pass
Tighten: Tighten the connecting rod bolts to 25 N.m (18 lb ft).
- Final Pass
Tighten: Tighten the connecting rod bolts an additional 110 degrees using the J 45059 .
- First Pass
- Align the lower crankcase with the dowel pins in the upper crankcase.
- Install the lower crankcase onto the upper crankcase slowly until feeling a positive stop.
- Inspect the upper-to-lower crankcase joint in order to make sure the lower crankcase is fully seated on the cylinder block.
- In order to gain access for the J 43690 and the J 43690-100 remove the oil scraper plate from the old oil manifold plate, if fastened into place.
- Install the old oil manifold plate.
- Install the old oil manifold plate bolts.
Tighten: Tighten the old oil manifold plate bolts to 10 N.m (89 lb in).
- Install the lower crankcase main bearing bolts.
- Install the left side upper-to-lower crankcase perimeter bolts.
- Install the right side upper-to-lower crankcase perimeter bolts.
- Install the lower crankcase main bearing bolts.
- First Pass
Tighten: Tighten the lower crankcase main bearing bolts (1-20) to 20 N.m (15 lb ft) in the proper sequence.
- Final Pass
Tighten: Tighten the lower crankcase main bearing bolts (1-20) an additional 65 degrees in the proper sequence using the J 45059 .
- First Pass
- Tighten the upper-to-lower crankcase perimeter bolts (1-10).
Tighten: Tighten the upper-to-lower crankcase perimeter bolts (1-10) to 30 N.m (22 lb ft) in the proper sequence.
- Using the J 39946 rotate the crankshaft until the crankshaft journal and the connecting rod to be measured is in the 12 o'clock position.
- Remove the crankshaft main bolts required to install the retainer plate J 43690-105.
- Install the J 43690-105 retainer plate and crankshaft main bolts. Refer to Lower Crankcase Installation for tightening specifications.
- Tighten the J 43690-105 retainer plate screw until snug in order to secure the crankshaft movement.
- Install the foot and bolt to the J 43690-101 pivot arm assembly. Tighten the bolt until snug.
- Install the J 43690-101 pivot arm assembly onto the connecting rod and tighten the screw securely.
- Install the base and bolt to the oil pan rail.
- Align the center of the base with the screw of the J 43690-101 pivot arm assembly. Tighten the bolt until snug.
- Align the link of the J 43690-101 pivot arm assembly on a plane equal to that of the connecting rod beam.
- Insert the pin to the base and J 43690-101 pivot arm assembly.
- Select the adapter as required and install to the swivel base. Tighten until snug.
- Install the swivel base to the oil pan rail.
- Install the indicator to the swivel base. Tighten the clamp of the base until snug.
- Adjust the swivel base as required and position the indicator tip slightly above the connecting rod cap. Lock the swivel base in position by rotating the locking lever.
- Rotate the fine adjustment knobs on the dial indicator end of the swivel base in order to position the tip of the indicator in contact with the connecting rod.
- Lightly actuate the handle of the pivot arm assembly, multiple times in both directions, to ensure the oil film is removed from the connecting rod.
- Load the handle in the forward position and zero the dial indicator. Load the handle multiple times in both directions and record the readings.
- Refer to Fastener Tightening Specifications for proper clearances.
- Remove the J 43690-105 retainer plate.
- Install the crankshaft main bolts. Refer to Lower Crankcase Installation for tightening specifications.
- Reposition the tools and repeat steps 2-21 for all other connecting rods.
- If clearances do not meet specifications, replace components as required.
- Remove the lower crankcase when the procedure is complete.