Installation Procedure
WARNING: This page is about a different variant/trim than selected.
- Collapse the right secondary camshaft chain tensioner using the following procedure:
- Rotate the ratchet release lever (2) counterclockwise and hold.
- Collapse the tensioner shoe (1) and hold.
- Release the ratchet lever (2).
- Slowly release the pressure on the shoe (1), until the ratchet lever (2) moves to the first detent and a "click" is heard and felt.
- Collapse the tensioner shoe (1) and hold.
- Insert a pin through the hole in the release lever in order to lock the tensioner shoe in the collapsed position.
- Install the right secondary camshaft drive chain tensioner and retaining bolts.
Tighten: Tighten the secondary camshaft drive chain tensioner bolts to 25 N.m (18 lb ft).
- Remove the pin holding the tensioner to tighten any slack in the timing chain.
- Inspect the 2 paint marks (1, 3) created previously to ensure they remain aligned with the timing marks (2, 4) on the actuator.
- Remove the mechanics wire (1) supporting the right secondary camshaft drive chain shoe (3).
- Remove the engine front cover bolt (2) from the front of the engine.
- Install the engine oil pump. Refer to Oil Pump Replacement .
- Remove the EN 46328 (1). See Special Tools .
- Install the right camshaft cover. Refer to Camshaft Cover Replacement - Right Side .
NOTE:
Refer to Fastener Notice
.
IMPORTANT:
Ensure the tensioner release lever is facing outward.