Installation Procedure
- Connect the electrical connectors.
- Install the screws securing the heads up display to the I/P.
Tighten: Tighten the screws to 2 N.m (18 lb in).
- Install the I/P retainer. Refer to Instrument Panel Retainer Replacement .
NOTE:
Refer to Fastener Notice
in Cautions and Notices.