Center Support Bolt/Cooler Pipe Fitting Installation
WARNING: This page does not describe the selected car, but rather 13 other vehicles, including the 2005 GMC Yukon XL, 2005 GMC Sierra, 2005 GMC Savana Special, 2005 GMC Savana Camper Special, and 2005 GMC Savana. However, it is still accessible from the selected car via links, so may be relevant.
Tools Required
J 23093 Center Support Alignment Tool. See Special Tools .
- Using the J 23093 , locate the center support 2nd clutch fluid passage through the hole in the case bottom. See Special Tools . Refer to Fluid Passages , Case Fluid Passages illustration.
- Push the J 23093 toward the low and reverse band servo bore, seating the center support splines against the case splines. See Special Tools .
- Install the new center support bolt (25).
Tighten: Maintain pressure on J 23093 while tightening the new center support bolt to 43 N.m (32 lb ft). See Special Tools .
- Ensure that the center support bolt head is seated to the bottom of the case.
- Install a new rear oil cooler pipe fitting seal (91) onto the rear oil cooler pipe fitting (90).
- Install the rear oil cooler pipe fitting (90) into the transmission case.
Tighten: Tighten the fitting to 35 N.m (26 lb ft).
IMPORTANT:
If the center support assembly has been reconditioned, you must use a new yellow-colored center support bolt in order to maintain proper bolt torque.
NOTE:
Refer to Fastener Notice
in Cautions and Notices.
IMPORTANT:
Do not overtighten the center support bolt.