Installation Procedure
- Install the IP cluster (3) to the IP.
- Connect the electrical connectors (2).
- Install the 4 fasteners (1).
Tighten: Tighten the cluster fasteners to 1.5 N.m (14 lb. in.).
- Install the IP cluster trim panel. Refer to Trim Panel Replacement - Instrument Panel (I/P) Cluster .
- Install the IP upper trim pad. Refer to Trim Pad Replacement - Instrument Panel (I/P) Upper (Standard Models) or Trim Pad Replacement - Instrument Panel (I/P) Upper (WC2/WC8) .
NOTE:
Refer to Fastener Notice in Cautions and Notices.