Installation Procedure
- Connect the electrical connectors and install the sunload sensors to the defroster grille. Refer to Sunload and Twilight Sentinel Sensor Replacement .
- Align the defroster grille (3) with the I/P carrier.
- Install the defroster grille fasteners (2).
Tighten: Tighten the defroster grille fasteners to 2 N.m (18 lb in).
- Install the I/P upper trim panel. Refer to Trim Pad Replacement - Instrument Panel (I/P) Upper .
- Enable the SIR. Refer to SIR Disabling and Enabling Zone 3 and SIR Disabling and Enabling Zone 5 in SIR.
NOTE:
Refer to Fastener Notice
in Cautions and Notices.