Home >> Cadillac >> 2004 >> CTS Base, 3.2 N >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 16 (Engine Mechanical - 3.6L (Ly7) (Repair Procedures -- 4 Of 5)) >> Off-Vehicle Repair Instructions - Part 3 >> Piston, Connecting Rod, and Bearing Installation >> Connecting Rod Bearing Clearance Measurement Procedure - Using J 43690 and J 43690-100

Connecting Rod Bearing Clearance Measurement Procedure - Using J 43690 and J 43690-100

WARNING: This page is about a different variant/trim than selected.

The J 43690  and the J 43690-100  have been developed as a more accurate method to measure connecting rod bearing clearances. The instructions below provide an overview of tool set-up and usage. For more detailed information, refer to the tool instruction sheets as supplied by the tool manufacturer.

Fig 1: Identifying Rod Bearing Clearance Checking Tool
GM627091Courtesy of GENERAL MOTORS CORP.

J 43690  Rod Bearing Clearance Checking Tool

Fig 2: Identifying Rod Bearing Clearance Tool - Adapter Kit
GM836375Courtesy of GENERAL MOTORS CORP.

J 43690-100  Rod Bearing Clearance Tool - Adapter Kit

    Fig 3: View Of Connecting Rod Bearing And Cap
    GM1313412Courtesy of GENERAL MOTORS CORP.
    IMPORTANT: Connecting rod bearings that have been run in an engine should NEVER be reused.
    Before final assembly it is important to check the clearance of the new connecting rod bearings.
  1. Install the connecting rod bearing into the connecting rod cap.
  2. IMPORTANT: The connecting rod is non-directional therefore the connecting rod bearing lock tangs can face inboard or outboard.
  3. Install the connecting rod end cap on its original connecting rod and ensure the bearing lock tangs are aligned on the same side of the rod.
  4. NOTE: Refer to Fastener Notice in Cautions and Notices.
    NOTE: Do not lubricate the NEW connecting rod bolts. The NEW bolts have a pre-applied graphite lubricant. Applying lubricant to the connecting rod bolts will effect the clamp load when the connecting rod bolts are torqued. Improper clamp load can lead to component failure and extensive engine damage.
    IMPORTANT: Reuse the old connecting rod bolts ONLY for measuring the connecting rod bearing clearance.
  5. Install the connecting rod bolts into the connecting rod cap.

    Tighten:  Tighten the connecting rod bolts to 30 N.m (22 lb ft).

  6. Loosen the connecting rod bolts until the torque reading is zero.
  7. Re-tighten the connecting rod bolts.
    1. First Pass

      Tighten:  Tighten the connecting rod bolts to 25 N.m (18 lb ft).

    2. Final Pass

      Tighten:  Tighten the connecting rod bolts an additional 110 degrees using the J 45059  .

  8. Rotate the crankshaft until the crankshaft journal and the connecting rod to be measured is in the 12 o'clock position.
  9. IMPORTANT: The crankshaft must be secure with no movement or rotation in order to obtain an accurate reading.
  10. Remove the crankshaft main bolts required to install the retainer plate J 43690-105.
  11. IMPORTANT: Do not allow the J 43690-105 retainer plate screw to contact the reluctor ring.
  12. Install the J 43690-105 and crankshaft main bolts.
  13. Loosen the connecting rod bolts until the torque reading is zero.
  14. Re-tighten the connecting rod bolts.
    1. First Pass

      Tighten:  Tighten the connecting rod bolts to 25 N.m (18 lb ft).

    2. Final Pass

      Tighten:  Tighten the connecting rod bolts an additional 110 degrees using the J 45059  .

  15. During and after installation, ensure each piston is positioned properly in the correct cylinder. The locating arrow on the top of each piston must be pointing toward the front of the engine.
  16. Repeat these procedures for the remaining piston/connecting rod assemblies using the EN 46111  in order to rotate the crankshaft.