Installation Procedure
- Install the knee bolster trim (1).
- Install the retaining screws (2).
Tighten: Tighten the fasteners to 2 N.m (18 lb in).
- Install the lever retainers screws.
Tighten: Tighten the fasteners to 2 N.m (18 lb in).
- Install the left hand closeout panel. Refer to Closeout/Insulator Panel Replacement - Left .
NOTE:
Refer to Fastener Notice
.