Installation Procedure
- Position the cluster on the I/P.
- Connect the electrical connectors (1) on the back of the cluster.
- Push the cluster into the I/P in order to lock in the cluster retainers.NOTE: Refer to FASTENER NOTICE in Cautions and Notices.
- Install the fasteners (2) in order to secure the cluster to the I/P.
Tighten
Tighten the fasteners to 2 N.m (18 lb in).