Installation Procedure
NOTE:
Do not use RTV or any other type of sealant on the EBCM gasket or mating surfaces.
- Install the EBCM (2) onto BPMV (1).
- Install the four EBCM bolts. Tighten the 4 bolts to 5 N.m (39 lbs in) in an X-pattern.NOTE: Do not reuse the old mounting bolts. Always install new EBCM bolts with the new BPMV.
- Connect the 2 way ABS pump motor connector to the EBCM.
- Install the BPMV (1) to EHCU bracket (3).
- Install the BPMV (1) to bracket retaining bolts (4). Tighten the bolts to 9 N.m (7 lbs ft).
- Install the EHCU to the vehicle frame (5). Tighten the three EHCU bracket bolts (4) to 25 N.m (18 lbs ft).
- Connect the 2 electrical harness connectors to the EBCM (1).NOTE: The brake pipes are held in place by a plastic bracket mounted to the frame. Make sure that the brake pipes stay in the correct place for proper reassembly.
- Install the 5 brake pipes to the BPMV (6). Tighten the brake pipe fittings to 25 N.m (18 lbs ft).
- Bleed the brake system. Refer to MANUAL BLEEDING or PRESSURE BLEEDING in Hydraulic Brakes before proceeding.
- Bleed the brake system. Refer to ABS Automated Bleed Procedure (w/JL4) or ABS Automated Bleed Procedure (w/o JL4) .