Installation Procedure
- Align the 4 retaining clips on the filler trim (3) with the slots in the opening bracket.
Push the filler trim (3) into place.
- Install the left sound insulator. Refer to Closeout/Insulator Panel Replacement - Left .
Push the filler trim (3) into place.