Installation Procedure
- Install the brake pressure modulator valve secondary pipe.
Brake Pressure Modulator Valve Secondary Pipe Fitting (1) - Install and tighten 32 N.m (24 lb ft)
Master Cylinder Secondary Brake Pipe Fitting (1) - Install and tighten 32 N.m (24 lb ft)
Clip (1) - Secure
Clip (1) - Secure
- Radiator Surge Tank - Install Radiator Surge Tank Replacement
- Install the battery. Battery Replacement (3.6L LGX)
- Bleed the brake system. Hydraulic Brake System Bleeding (Pressure) , or Hydraulic Brake System Bleeding (Manual)