Installation Procedure
Install 3 new foam pads (1) to the head-up display (2) as shown in the graphic.
Head-Up Display (2) - Install
- Electrical Connector (3) Connect [2x]
- Head-Up Display Bolt (1) - Install, but do NOT tighten [4x]
-
CAUTION:
Head-Up Display Bolt (1) - Tighten in sequence [4x] 2. 5 N. m (22 lb in)
- Instrument Panel Assembly - Install - Instrument Panel Assembly Replacement
- Battery Negative Cable - Connect - Battery Negative Cable Disconnection and Connection (3. 6L LGX) , or Battery Negative Cable Disconnection and Connection (2. 0L LTG)
- Head-Up Display - Programming and Setup - Control Module References