Installation Procedure
WARNING: This page is about a different variant/trim than selected.
- Install the oil level indicator tube (1) to the oil pan along with a NEW seal ring (3).
- Install the oil level indicator tube bracket bolt (2) and tighten to 10 N.m (89 lb in).
- Clip the ECM wiring harness to the oil level indicator tube bracket.
- Install the air cleaner outlet duct. Refer to Air Cleaner Outlet Duct Replacement .
CAUTION:
Refer to Fastener Caution .