Installation Procedure
WARNING: This page is about a different variant/trim than selected.
- Install the high voltage cable (2) to the BECM junction block and tighten the fasteners (1) to 9 N.m (80 lb in).
- Enable the hybrid battery. Refer to High Voltage Enabling .
CAUTION:
Refer to Fastener Caution .
NOTE:
Critical high voltage fastener. Perform second torque verification check following re-assembly.