LEMON Manuals: Even more car manuals for everyone
Home >> Buick >> 2015 >> Regal GS, AWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 4 (Engine Controls And Fuel - 2.4L - Repair Instructions) >> Repair Instructions >> Secondary Air Injection Check Valve Replacement - Left Side (LUK)

Secondary Air Injection Check Valve Replacement - Left Side (LUK)

WARNING: This page is about a different variant/trim than selected.
Fig 1: Secondary Air Injection Check Valve - Left Side
GM2714481Courtesy of GENERAL MOTORS COMPANY
Callout Component Name

Preliminary Procedure

  1. Remove the intake manifold cover. Refer to Intake Manifold Cover Replacement .
  2. Disconnect the secondary air injection pipe hose from the secondary air injection check valve.
1 Secondary Air Injection Check Valve Bolt (Qty:2)
CAUTION:

Refer to Fastener Caution .


Tighten 
10 N.m (89 lb in)
2 Secondary Air Injection Check Valve
Procedure 
Disconnect the electrical connector.
3 Secondary Air Injection Check Valve Gasket