Installation Procedure
WARNING: This page is about a different variant/trim than selected.
- Install the generator control module cooling air outlet duct (2) and tighten the fasteners (1) to 9 (80 lb in).
- Install the drive motor battery cooling blower outlet duct (2) and tighten the fasteners (1) to 9 (80 lb in).
- Enable the hybrid battery. Refer to High Voltage Enabling .
CAUTION:
Refer to Fastener Caution .