Circuit/System Testing
- Ignition OFF, scan tool disconnected, all doors closed, all accessories OFF, disconnect the harness connector at the S78 turn signal/multifunction switch. It may take up to 2 minutes for all vehicle systems to power down.
- Test for less than 15Ω between the ground circuit terminal 3 and ground.
- Ignition OFF.
- Test for less than 2Ω in the ground circuit end to end.
- If 2Ω or greater, repair the open/high resistance in the circuit.
- If less than 2Ω, repair the open/high resistance in the ground connection.
- Ignition ON.
- Verify the scan tool Headlamps Flash Switch parameter is Inactive.
- Ignition OFF, disconnect the X3 harness connector at the K9 body control module.
- Test for infinite resistance between the signal circuit terminal 4 and ground.
- If less than infinite resistance, repair the short to ground on the circuit.
- If infinite resistance, replace the K9 body control module.
- Install a 3A fused jumper wire between the signal circuit terminal 4 and the ground circuit terminal 3.
- Verify the scan tool Headlamps Flash Switch parameter is Active.
- Ignition OFF, disconnect the X3 harness connector at the K9 body control module, ignition ON.
- Test for less than 1V between the signal circuit terminal 4 and ground.
- If 1V or greater, repair the short to voltage on the circuit.
- Test for less than 2Ω in the signal circuit end to end.
- If 2Ω or greater, repair the open/high resistance in the circuit.
- If less than 2Ω, replace the K9 body control module.
- Test or replace the S78 turn signal/multifunction switch.