LEMON Manuals: Even more car manuals for everyone
Home >> Buick >> 2007 >> Lucerne CX >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 2 (Automatic Transaxle - 4T80-E - Introduction (2 Of 2)) >> Repair Instructions >> Repair Instructions - Off Vehicle >> Final Drive End Play Measurement

Final Drive End Play Measurement

WARNING: This page is about a different variant/trim than selected.

Tools Required

    Fig 1: View Of J 25025-7A & J 8001 Measuring End Play Clearance
    GM11838Courtesy of GENERAL MOTORS CORP.
  1. Install the J 25025-7A  and the J 8001  . See Special Tools .
  2. Position the dial indicator with the stem contacting the output shaft (112). Zero the dial indicator.
  3. Insert the J 28585  through the vehicle speed sensor bore and lift the speed sensor rotor for measurement. Protect the bore with a piece of wood or a suitable piece of plastic.
  4. Proper end play clearance is 0.15-0.65 mm (0.006-0.026 in).
  5. Record the measured specification. If necessary make an adjustment during reassembly using a selective thrust washer with the proper thickness.
  6. Remove the dial indicator set and the post.