Installation Procedure
WARNING: This page is about a different car, the 2006 Pontiac Montana SV6, 2006 Chevrolet Uplander, and 2006 Buick Terraza. However, it is still accessible from the selected car via links, so may be relevant.
- Align the wiring harness retainers.
- Push in on the wiring harness (2) until the harness is secure.
- Install the I/P. Refer to Instrument Panel (I/P) Assembly Replacement .
- Connect the wiring harness connectors under the I/P.
- Connect the wiring harness connectors under the hood.
- Enable the SIR. Refer to SIR Disabling and Enabling Zone 3 and SIR Disabling and Enabling Zone 5 .
IMPORTANT:
Ensure that the electrical connectors are routed correctly through the instrument panel.