LEMON Manuals: Even more car manuals for everyone
Home >> Buick >> 2007 >> Lucerne CX >> Repair and Diagnosis >> External Pages >> Different car >> Section 172 (Horn System) >> Description and Operation >> Horns System Description and Operation >> Circuit Operation

Circuit Operation

WARNING: This page is about a different car, the 2006 Pontiac Montana SV6, 2006 Chevrolet Uplander, and 2006 Buick Terraza. However, it is still accessible from the selected car via links, so may be relevant.

Battery positive voltage is applied at all times to the horn relay coil and the horn relay switch. Pressing the horn switch applies ground to the horn switch signal circuit. The BCM applies ground to the horn relay control circuit as described above. When the horn relay control circuit is grounded, the horn relay is energized and battery positive voltage is applied to the horns through the horn control circuit. The horns sound as long as ground is applied to the horn relay control circuit.