LEMON Manuals: Even more car manuals for everyone
Home >> Buick >> 2007 >> Lucerne CX >> Repair and Diagnosis >> External Pages >> Different car >> Section 101 (Engine Control System - 3.8L - Introduction (2 Of 2)) >> Repair Instructions >> Secondary Air Injection (AIR) Shut-Off Valve Outlet Pipe/Hose Replacement >> Installation Procedure

Installation Procedure

WARNING: This page is about a different car, the 2006 Buick LaCrosse and 2006 Buick Allure. However, it is still accessible from the selected car via links, so may be relevant.
  1. Install the outlet pipe to the shut-off valve.
  2. Install the AIR shut-off valve outlet pipe/hose and shut-off valve assembly. Refer to Secondary Air Injection (AIR) Shut-Off Valve Replacement .