LEMON Manuals: Even more car manuals for everyone
Home >> Buick >> 2007 >> Allure CX >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 2 (Engine Mechanical - 3.6L - 1 Of 5) >> On-Vehicle Repair Instructions (1 Of 2) >> Camshaft Position Actuator Replacement - Bank 1 (Right Side) Intake >> Installation Procedure

Installation Procedure

WARNING: This page is about a different variant/trim than selected.
    Fig 1: View Of Camshaft Position (CMP) Actuator - Bank 1 Intake
    GM946228Courtesy of GENERAL MOTORS CORP.
  1. Install the camshaft position actuator to the timing chain.
  2. Install the camshaft. Refer to Camshaft Replacement - Right Side .