Circuit/System Testing
WARNING: This page is about a different car, the 2008 Buick LaCrosse and 2008 Buick Allure. However, it is still accessible from the selected car via links, so may be relevant.
- Ignition OFF, disconnect the harness connector at the sunload sensor assembly.
- Test for less than 1.0 ohm of resistance between the ground circuit terminal C and ground.
- If greater than the specified range, test the ground circuit for an open/high resistance.
- Ignition ON, verify the sunload sensor parameter is greater than 250 counts.
- If not the specified value, test the appropriate signal circuit terminal A or B for a short to ground. If the circuit tests normal, replace the HVAC control module.
- Install a 3A fused jumper wire between ground circuit terminal C and the appropriate signal circuit terminal of the sensor listed below. Verify the appropriate sunload sensor parameter is less than 5 counts.
- Sunload sensor circuit terminal A.
- Sunload sensor circuit terminal B.
- If not the specified value, test the signal circuit for a short to voltage or an open/high resistance. If the circuit tests normal, replace the HVAC control module.
- If all circuits test normal, replace the sunload sensor assembly.